Gibson-Lewis, LLC negotiated with Great Lakes Prefabrication to provide the installations of cold-formed metal frame prefabricated panels with Sto cladding systems. This project was completed within a six week time frame for the entire four story envelope. The owner and General Contractor were pleased with the quality and performance, which allowed us to negotiate with Great Lakes Prefabrication the MOB project planned early winter of 2020.