This $70 Million dollar educational facility represents one of the largest construction projects in Notre Dame’s history. As you first enter this building, you are immediately impressed with a 70 foot high, four story galleria. Included in this 202,000sf facility are 40 laboratories, 22 faculty offices, two 250-seat lecture halls, a 150-seat multimedia auditorium, a greenhouse, herbarium, and observatory.
Gibson-Lewis served as the General Trades contractor and self-performed the carpentry, millwork, doors & hardware, metal studs and drywall, acoustical and painting.