This rapid enclosure completed during late fall 2019 eliminated the need for cold weather protection and allowed the interior trades to proceed much earlier than with a comon conventional build.
The construction showcases a beautiful design that is meant to create a homelike atmosphere for the many guests that pass through every year. This project is allowing our team to showcase their expert knowledge in detailed high-end construction.
Completed multi phase remodel of the cafeteria while it remained open.
Our team completed more than 22 miles of metal stud framed wall system as well as 3 million square feet of drywall board products. This project met the anticapted schedule and budget with an overall success at all levels.
This is one of many medical facilities that we have had the opportunity to complete for St. Joseph Regional Medical Center. this project included the renovations of existing commercial space in order to create a top of the line medical facility.
Gibson‐Lewis continues its successful relationship of more than 30 years with Memorial Hospital of South Bend on this project which is critical to the health and well being of our community.
Gibson-Lewis, LLC provided the expert craftsmanship and attention to detail needed to support the implementation of this sound system.
Gibson-Lewis, LLC completed this LEED project as a General Contractor, coordinating all aspects of owner/architectural/construction activity which also included a multitude of self performed work.
The scope on this project included site and grounds work as well as building renovations.
The unique project of renovating this sacred place consisted of restoring all existing stone in the chapel.
Our expertise in management and execution allowed us to complete this project in only six weeks.
This $70 Million dollar educational facility represents one of the largest construction project in Notre Dame’s history.
Project included renovation of the food court, restrooms and mall corridor.
Despite obstacles, Gibson-Lewis, LLC brought the project to completion with great satisfaction to the customer generating several additional projects in the shopping center.
Work consisted of major renovations to their existing facility, to organize operations as well as provide an updated call center facility to better serve their customer needs.
This renovated space serves as a community center on the main level and a YMCA on the lower level.
Gibson-Lewis, LLC took on the role of General Contractor for the new Fire Station #4 which is the first City-owned building in South Bend designed with green standards registered and achieved LEED Gold Certification.
This is one of five library projects that Gibson-Lewis has been involved in for LaPorte County this year.
As the GC we managed all phases of work, and completed the project in about 12 months. The intent of the project was to provide the best space possible for the owner’s specific uses.
This project included over four thousand square feet of renovation and addition to the original structure which was built in 1926.